ait-deutschlandalpha innotec SWCV 122H1 (1~230V)

The ait-deutschland alpha innotec SWCV 122H1 (1~230V) is a heat pump with SCOP (35 °C) 5.25 and refrigerant R407C.1
Key figures
Rules in the UK
Boiler Upgrade Scheme
Check conditions£7,500 – £9,0002Fixed grant (England & Wales)
Fixed grant in England and Wales, deducted from your installer’s quote. £9,000 when replacing oil or LPG off the gas grid (until March 2027). Scotland: Home Energy Scotland grant instead.3,4
- Must be MCS-certified (product and installer). Check the Ofgem product eligibility list.
- Rated output 11.6 kW; the scheme covers systems up to 45 kW.
- SCOP at 55 °C: 4.12. The installed system needs a SCOP of at least 2.8 (MCS calculation).
Technical specifications
| General | |
|---|---|
| Type (source) | Ground source1 |
| Performance | |
| Rated output 35 °C | 11.6 kW1 |
| Rated output 55 °C | 12.4 kW1 |
| Efficiency | |
| SCOP (35 °C) | 5.251 |
| SCOP (55 °C) | 4.121 |
| Seasonal efficiency ηs 35 °C | 201 %1 |
| Seasonal efficiency ηs 55 °C | 157 %1 |
| Energy label 35 °C | A, , , 1 |
| Energy label 55 °C | A, , , 1 |
| Noise | |
| Indoor unit sound power | 44 dB(A)1 |
| Refrigerant | |
| Refrigerant | R407C1 |
| Refrigerant GWP | 1,7741 |
| Refrigerant charge | 2 kg1 |
Manufacturer documentation
External links to ait-deutschland's official website. The manufacturer may change or move documents; where they differ, the manufacturer's latest version applies.
Frequently asked questions
What is the SCOP (35 °C) of the ait-deutschland alpha innotec SWCV 122H1 (1~230V)?
The SCOP (35 °C) of the ait-deutschland alpha innotec SWCV 122H1 (1~230V) is 5.25.1
Which refrigerant does the ait-deutschland alpha innotec SWCV 122H1 (1~230V) use?
The refrigerant of the ait-deutschland alpha innotec SWCV 122H1 (1~230V) is R407C.1
How much Boiler Upgrade Scheme grant can you get for the ait-deutschland alpha innotec SWCV 122H1 (1~230V)?
£7,500 in England and Wales, provided the product and installer are MCS-certified (£9,000 when replacing oil or LPG off the gas grid, until March 2027). The installer applies and deducts the grant from your quote.1
Sources
- Heat Pump Keymark certificates — EHPA / DIN CERTCO (Heat Pump KEYMARK) · accessed 29 Sept 2026
- Boiler Upgrade Scheme: what you can get — GOV.UK · accessed 27 Sept 2026
- Boiler Upgrade Scheme: guidance for installers (V5) — Ofgem · accessed 27 Sept 2026
- Boiler Upgrade Scheme product eligibility — Ofgem · accessed 27 Sept 2026