Heat pumps · UK

ProCalor ProGH10-32DC

The ProCalor ProGH10-32DC is a heat pump with SCOP (35 °C) 6.95 and refrigerant R032.1,2

Key figures

SCOP (35 °C)
6.952

Seasonal efficiency: how much heat you get per kWh of electricity across a heating season.

Refrigerant
R0321
Official source
Type (source)
Water-to-water1
Official source
Rated output 35 °C
10kW2
Official source
Rated output 55 °C
9kW2
Official source
UK

Rules in the UK

Boiler Upgrade Scheme

Check conditions

£7,500 – £9,0003Fixed grant (England & Wales)

Fixed grant in England and Wales, deducted from your installer’s quote. £9,000 when replacing oil or LPG off the gas grid (until March 2027). Scotland: Home Energy Scotland grant instead.4,5

  • Must be MCS-certified (product and installer). Check the Ofgem product eligibility list.
  • Rated output 10 kW; the scheme covers systems up to 45 kW.
  • SCOP at 55 °C: 4.98. The installed system needs a SCOP of at least 2.8 (MCS calculation).
Heat pump grants in the UK explained →

Technical specifications

General
Type (source)Water-to-water1
Performance
Rated output 35 °C10 kW2
Rated output 55 °C9 kW2
Efficiency
SCOP (35 °C)6.952
SCOP (55 °C)4.982
Seasonal efficiency ηs 35 °C275 %2
Seasonal efficiency ηs 55 °C196 %2
Energy label 35 °CA+++2
Energy label 55 °CA+++2
Noise
Indoor unit sound power44 dB(A)2
Refrigerant
RefrigerantR0321
Refrigerant GWP6751
Grants & market
ISDE grant (NL)4,425 €1

Similar models

Other brands, same type and a comparable size.

More from ProCalor

All ProCalor models (3) →

Guides on heat pumps

How we collect and check this data →

Frequently asked questions

What is the SCOP (35 °C) of the ProCalor ProGH10-32DC?

The SCOP (35 °C) of the ProCalor ProGH10-32DC is 6.95.1,2

Which refrigerant does the ProCalor ProGH10-32DC use?

The refrigerant of the ProCalor ProGH10-32DC is R032.1,2

How much Boiler Upgrade Scheme grant can you get for the ProCalor ProGH10-32DC?

£7,500 in England and Wales, provided the product and installer are MCS-certified (£9,000 when replacing oil or LPG off the gas grid, until March 2027). The installer applies and deducts the grant from your quote.1,2

Sources

  1. ISDE heat pump notification code list — Rijksdienst voor Ondernemend Nederland (RVO) · accessed 25 Oct 2026
  2. European Product Registry for Energy Labelling (EPREL) – heat pumps — Europese Commissie · accessed 15 Oct 2026
  3. Boiler Upgrade Scheme: what you can get — GOV.UK · accessed 27 Sept 2026
  4. Boiler Upgrade Scheme: guidance for installers (V5) — Ofgem · accessed 27 Sept 2026
  5. Boiler Upgrade Scheme product eligibility — Ofgem · accessed 27 Sept 2026