EV chargers · UK

go-e Charger Gemini 2.0 11 kW

go-e Charger Gemini 2.0 11 kW
Image: go-erequest removal

The go-e Charger Gemini 2.0 11 kW is an EV charger with max. charging power (AC) 11 kW, 3 phases and connector Type 2 socket.1

Key figures

Max. charging power (AC)
11kW1
Phases
31
Manufacturer data
Connector
Socket1Type 2
Manufacturer data
OCPP
1.61
Manufacturer data
Dynamic load balancing
Yes1
Manufacturer data
UK

Rules in the UK

Home chargers sold in Great Britain must meet the smart charge point regulations (smart functionality, default off-peak charging).

Technical specifications

General
ConnectorSocket (Type 2)1
Min. operating temperature-25 °C1
Performance
Max. charging power (AC)11 kW1
Electrical
Phases31
1↔3 phase switchingYes1
Max. current per phase16 A1
Min. charging current6 A1
Connectivity & smart
OCPP1.61
Wi-FiYes1
4G/LTEYes1
RFID card readerYes1
Dynamic load balancingYes1
Solar surplus chargingYes1
Safety & metering
Built-in 6 mA DC leakage detectionYes1
IP ratingIP651
IK ratingIK081
Dimensions & weight
Weight1.85 kg1
Warranty & lifespan
Warranty3 years1

Manufacturer documentation

External links to go-e's official website. The manufacturer may change or move documents; where they differ, the manufacturer's latest version applies.

Compare with

Similar models

Other brands, same type and a comparable size.

More from go-e

All go-e models (6) →

Featured in these lists

Guides on EV chargers

How we collect and check this data →

Frequently asked questions

What is the max. charging power (AC) of the go-e Charger Gemini 2.0 11 kW?

The max. charging power (AC) of the go-e Charger Gemini 2.0 11 kW is 11 kW.1

How many phases does the go-e Charger Gemini 2.0 11 kW use?

The go-e Charger Gemini 2.0 11 kW uses 3 phases.1

Which connector does the go-e Charger Gemini 2.0 11 kW use?

The connector of the go-e Charger Gemini 2.0 11 kW is Type 2 socket.1

Which OCPP version does the go-e Charger Gemini 2.0 11 kW support?

The go-e Charger Gemini 2.0 11 kW supports OCPP 1.6.1

Sources

  1. go-e Charger Gemini 2.0 – Data sheet, V 1.0 — go-e GmbH · accessed 27 Sept 2026