EV chargers · UK

Alfen Eve Double Pro-line 3-phase

Alfen Eve Double Pro-line 3-phase
Image: Alfenrequest removal

The Alfen Eve Double Pro-line 3-phase is an EV charger with max. charging power (AC) 22 kW, 3 phases and connector Type 2 socket.1

Key figures

Max. charging power (AC)
22kW1
Phases
31
Manufacturer data
Connector
Socket1Type 2
Manufacturer data
OCPP
2.0.11
Manufacturer data
Dynamic load balancing
Yes1
Manufacturer data
UK

Rules in the UK

Home chargers sold in Great Britain must meet the smart charge point regulations (smart functionality, default off-peak charging).

Technical specifications

General
ConnectorSocket (Type 2)1
Number of outlets21
Performance
Max. charging power (AC)22 kW1
Electrical
Phases31
Max. current per phase32 A1
Connectivity & smart
OCPP2.0.11
EthernetYes1
4G/LTEYes1
RFID card readerYes1
DisplayYes1
Dynamic load balancingYes1
Smart meter (P1) inputYes1
Safety & metering
MID-certified meterYes1
Built-in 6 mA DC leakage detectionYes1
IP ratingIP541
IK ratingIK101
Dimensions & weight
Width338 mm1
Height590 mm1
Depth230 mm1
Weight15 kg1

Manufacturer documentation

External links to Alfen's official website. The manufacturer may change or move documents; where they differ, the manufacturer's latest version applies.

Compare with

Similar models

Other brands, same type and a comparable size.

More from Alfen

All Alfen models (12) →

Featured in these lists

Guides on EV chargers

How we collect and check this data →

Frequently asked questions

What is the max. charging power (AC) of the Alfen Eve Double Pro-line 3-phase?

The max. charging power (AC) of the Alfen Eve Double Pro-line 3-phase is 22 kW.1

How many phases does the Alfen Eve Double Pro-line 3-phase use?

The Alfen Eve Double Pro-line 3-phase uses 3 phases.1

Which connector does the Alfen Eve Double Pro-line 3-phase use?

The connector of the Alfen Eve Double Pro-line 3-phase is Type 2 socket.1

Which OCPP version does the Alfen Eve Double Pro-line 3-phase support?

The Alfen Eve Double Pro-line 3-phase supports OCPP 2.0.1.1

Sources

  1. Datasheet Eve Double Pro-line, V4.2 — Alfen ICU B.V. · accessed 29 Sept 2026